Home
Print 
Contact 
Impressum 
Help
Work Product Items

Input Work Products Output Work Products
 
1.3 Software Item 1.3 Software Item
  1.4 Knowledge Item
2.0 Contract 2.0 Contract
2.1 Commitment / Agreement 2.1 Commitment / Agreement
3.0 Data
3.1 Assessment Data 3.1 Assessment Data
3.2 Asset Use Data 3.2 Asset Use Data
3.3 Benchmarking Data 3.3 Benchmarking Data
3.4 Customer Satisfaction Data 3.4 Customer Satisfaction Data
 
3.6 Process Performance Data 3.6 Process Performance Data
3.7 Test Data 3.7 Test Data
 
  4.1 Database Design
4.2 Domain Architecture 4.2 Domain Architecture
4.3 Domain Model 4.3 Domain Model
4.4 High Level Software Design 4.4 High Level Software Design
4.5 Low Level Software Design 4.5 Low Level Software Design
4.6 System Architecture Design 4.6 System Architecture Design
4.7 Organisational Structure 4.7 Organisational Structure
5.0 Goals 5.0 Goals
5.1 Assessment Goals 5.1 Assessment Goals
5.2 Business Goals 5.2 Business Goals
5.3 Core Values Statement 5.3 Core Values Statement
5.4 Mission Statement 5.4 Mission Statement
5.5 Vision Statement 5.5 Vision Statement
 
6.1 Customer Manual 6.1 Customer Manual
  6.2 Handling and Storage Guide
6.3 Installation Guide 6.3 Installation Guide
6.4 Training Material 6.4 Training Material
6.5 Product Operation Guide 6.5 Product Operation Guide
7.0 Measure
7.1 Customer Satisfaction Survey 7.1 Customer Satisfaction Survey
7.2 Field Measure 7.2 Field Measure
7.4 Process Measure 7.4 Process Measure
7.5 Project Measure 7.5 Project Measure
7.6 Quality Measure 7.6 Quality Measure
7.7 Risk Measure 7.7 Risk Measure
7.8 Service Level Measure 7.8 Service Level Measure
8.0 Plan 8.0 Plan
8.1 Acceptance Test Plan 8.1 Acceptance Test Plan
8.2 Acquisition Plan 8.2 Acquisition Plan
8.3 Process Assessment Plan 8.3 Process Assessment Plan
8.4 Configuration Management Plan 8.4 Configuration Management Plan
8.5 Development Environment Plan 8.5 Development Environment Plan
8.6 Project Activity Network 8.6 Project Activity Network
  8.7 System Integration Test Plan
8.8 Human Resource Management Plan 8.8 Human Resource Management Plan
8.9 Installation and Maintenance Plan 8.9 Installation and Maintenance Plan
8.10 Software Integration Test Plan 8.10 Software Integration Test Plan
8.11 Logistics Maintenance Plan 8.11 Logistics Maintenance Plan
8.12 Project Plan 8.12 Project Plan
8.13 Quality Plan 8.13 Quality Plan
  8.14 Recovery Plan
8.15 Regression Test Plan 8.15 Regression Test Plan
8.16 Release Plan 8.16 Release Plan
8.17 Reuse Plan 8.17 Reuse Plan
8.18 Review Plan 8.18 Review Plan
8.19 Risk Management Plan 8.19 Risk Management Plan
8.20 Risk Mitigation Plan 8.20 Risk Mitigation Plan
8.21 Software Test Plan 8.21 Software Test Plan
8.22 System Test Plan 8.22 System Test Plan
  8.23 Validation Test Plan
8.24 Training Plan 8.24 Training Plan
  8.25 Unit Test Plan
  8.26 Documentation Plan
  8.27 Problem Management Plan
  8.28 Change Management Plan
8.29 Improvement Plan 8.29 Improvement Plan
  9.0 Policy
9.1 Personnel Policy 9.1 Personnel Policy
9.2 Quality Policy 9.2 Quality Policy
9.3 Reuse Policy 9.3 Reuse Policy
9.4 Supplier Selection Policy 9.4 Supplier Selection Policy
10.0 Process Description 10.0 Process Description
10.1 Life Cycle Model
10.2 Test Procedure 10.2 Test Procedure
10.3 Customer Support Procedure 10.3 Customer Support Procedure
11.0 Product
11.1 Software Product 11.1 Software Product
  11.2 Software Element
11.3 Product Release Information 11.3 Product Release Information
11.4 Product Release Package 11.4 Product Release Package
11.5 Software Unit 11.5 Software Unit
11.6 System 11.6 System
  11.7 Temporary Solution
11.8 System Element 11.8 System Element
 
12.1 Request for Proposal 12.1 Request for Proposal
12.2 Retirement Request 12.2 Retirement Request
12.3 Reuse Proposal 12.3 Reuse Proposal
12.4 Supplier Proposal Response 12.4 Supplier Proposal Response
13.0 Record 13.0 Record
  13.1 Acceptance Record
  13.3 Back-up/Recovery Record
13.4 Communication Record 13.4 Communication Record
  13.5 Contract Review Record
13.6 Delivery Record 13.6 Delivery Record
13.7 Problem Record 13.7 Problem Record
  13.8 Installation Record
13.9 Meeting Support Record 13.9 Meeting Support Record
  13.10 Configuration Management Record
13.11 Personnel Performance Review Record 13.11 Personnel Performance Review Record
13.12 Personnel Record 13.12 Personnel Record
  13.13 Product Release Approval Record
13.14 Progress Status Record 13.14 Progress Status Record
  13.15 Proposal Review Record
13.16 Change Request 13.16 Change Request
13.17 Customer Request
13.18 Quality Record 13.18 Quality Record
13.19 Review Record 13.19 Review Record
13.20 Risk Action Request 13.20 Risk Action Request
13.21 Change Control Record 13.21 Change Control Record
13.22 Traceability Record 13.22 Traceability Record
13.23 Training Record 13.23 Training Record
  13.24 Validation Results
  13.25 Verification Results
 
  14.1 Change History
14.2 Corrective Action Register 14.2 Corrective Action Register
14.3 Hardware Assets Register 14.3 Hardware Assets Register
  14.4 Test Log
  14.5 Preferred Suppliers Register
14.6 Schedule 14.6 Schedule
14.7 Software Assets Register 14.7 Software Assets Register
1.0 Configuration Item 1.0 Configuration Item
1.1 Product Configuration 1.1 Product Configuration
1.2 Reusable Object 1.2 Reusable Object
14.8 Tracking System 14.8 Tracking System
14.9 Work Breakdown Structure 14.9 Work Breakdown Structure
14.10 Work Product Distribution Register 14.10 Work Product Distribution Register
  14.11 Work Product List
  15.1 Analysis Report
15.3 Configuration Status Report 15.3 Configuration Status Report
15.4 Market Analysis Report 15.4 Market Analysis Report
15.5 Evaluation Report 15.5 Evaluation Report
  15.6 Project Status Report
  15.7 Reuse Evaluation Report
15.8 Risk Analysis Report 15.8 Risk Analysis Report
  15.9 Risk Status Report
15.10 Test Incident Report 15.10 Test Incident Report
  15.11 Defect Report
  15.12 Problem Status Report
15.13 Assessment Report 15.13 Assessment Report
15.14 Customer Satisfaction Report
15.15 Human Resource Needs Analysis 15.15 Human Resource Needs Analysis
15.16 Improvement Opportunity 15.16 Improvement Opportunity
  15.17 Personnel Performance Evaluation
15.18 Process Performance Report 15.18 Process Performance Report
15.19 Product Needs Assessment 15.19 Product Needs Assessment
  15.20 Service Level Performance
  15.21 Supplier Evaluation Report
15.22 Training Evaluation Report 15.22 Training Evaluation Report
  16.1 Assessment Results Repository
16.2 Asset Repository 16.2 Asset Repository
16.3 Configuration Management Library
16.4 Knowledge Repository 16.4 Knowledge Repository
16.5 Re-use Library 16.5 Re-use Library
16.6 Process Repository 16.6 Process Repository
17.0 Requirement Specification
17.1 Asset Specification 17.1 Asset Specification
17.2 Build List 17.2 Build List
17.3 Customer Requirements 17.3 Customer Requirements
  17.4 Delivery Instructions
17.5 Documentation Requirements 17.5 Documentation Requirements
17.6 Domain Interface Specification 17.6 Domain Interface Specification
17.7 Infrastructure Requirements 17.7 Infrastructure Requirements
17.8 Interface Requirements 17.8 Interface Requirements
17.9 Product Requirements 17.9 Product Requirements
17.10 Service Requirements 17.10 Service Requirements
17.11 Software Requirements 17.11 Software Requirements
17.12 System Requirements 17.12 System Requirements
17.13 Test Design Specification 17.13 Test Design Specification
18.0 Standard
18.1 Acceptance Criteria 18.1 Acceptance Criteria
18.2 Assessment Method Standard
18.3 Coding Standard 18.3 Coding Standard
18.4 Domain Representation Standard 18.4 Domain Representation Standard
18.5 Personnel Performance Criteria 18.5 Personnel Performance Criteria
18.6 Product Release Criteria 18.6 Product Release Criteria
18.7 Quality Criteria 18.7 Quality Criteria
18.8 Supplier Selection Criteria 18.8 Supplier Selection Criteria
19.0 Strategy 19.0 Strategy
19.1 Asset Management Strategy 19.1 Asset Management Strategy
  19.2 Process Strategy
  19.3 Knowledge Management Strategy
19.4 Product Release Strategy 19.4 Product Release Strategy
19.5 Reuse Strategy 19.5 Reuse Strategy
  19.6 Maintenance Strategy
19.7 Software Development Methodology 19.7 Software Development Methodology
19.8 Training Strategy 19.8 Training Strategy
  19.10 Verification Strategy
  19.11 Validation Strategy
19.12 Audit Strategy 19.12 Audit Strategy
  20.0 Template
21.0 Work Product 21.0 Work Product
  8.30 Verification Plan
  10.4 Quality Manual
  13.26 Assessment Record
13.27 Retirement Notification 13.27 Retirement Notification
15.23 Test Item Transmittal Report 15.23 Test Item Transmittal Report
15.24 Audit Report 15.24 Audit Report
17.14 Test Case Specification 17.14 Test Case Specification

SuppliersReceivers
 
ACQ.1 Acquisition Preparation
ACQ.2 Supplier Selection
ACQ.3 Contract Agreement
ACQ.4 Supplier Monitoring
ACQ.5 Customer Acceptance
SPL.1 Supplier Tendering
SPL.2 Product Release
SPL.3 Product Acceptance Support
ENG.1 Requirements Elicitation
ENG.2 System Requirements Analysis
ENG.3 System Architectural Design
ENG.4 Software Requirements Analysis
ENG.5 Software Design
ENG.6 Software Construction
ENG.7 Software Integration
ENG.8 Software Testing
ENG.9 System Integration
ENG.10 System Testing
ENG.11 Software Installation
ENG.12 Software and System Maintenance
OPE.1 Operational Use
OPE.2 Customer Support
SUP.1 Quality Assurance
SUP.2 Verification
SUP.3 Validation
SUP.4 Joint Review
SUP.5 Audit
SUP.6 Product Evaluation
SUP.7 Documentation
SUP.8 Configuration Management
SUP.9 Problem Resolution Management
SUP.10 Change Request Management
MAN.1 Organisational Alignment
MAN.2 Organisation Management