Print
Contact
Impressum
Help
Introduction
Reference Model
Processes
Practices
Work Products
Project
Deliverables
Work Product Items
Activities
Assessment
Evidence
Instruments
Specifications
Templates
Checklists
Glossary
References
Assessment
Select processes
ACQ.1 Acquisition Preparation
[Details]
GO
ACQ.2 Supplier Selection
[Details]
GO
ACQ.3 Contract Agreement
[Details]
GO
ACQ.4 Supplier Monitoring
[Details]
GO
ACQ.5 Customer Acceptance
[Details]
GO
ENG.1 Requirements Elicitation
[Details]
GO
ENG.2 System Requirements Analysis
[Details]
GO
ENG.3 System Architectural Design
[Details]
GO
ENG.4 Software Requirements Analysis
[Details]
GO
ENG.5 Software Design
[Details]
GO
The purpose of the process is to provide a design for the software that implement and can be verified against the requirements.
Outcomes
[1]
A software architectural design is developed and baselined that describes the software elements that will implement the software requirements.
[2]
Internal and external interfaces of each software elements are defined.
[3]
A detailed design is developed that describes software units that can be built and tested.
[4]
Consistency and traceability are established between software requirements and software design.
Input Workproducts
Output Workproducts
17.8
Interface Requirements [2]
17.11
Software Requirements [1, 4]
4.1
Database Design [3, 4]
4.4
High Level Software Design [1, 2, 4]
4.5
Low Level Software Design [2, 3, 4]
11.2
Software Element [1]
13.22
Traceability Record [4]
17.13
Test Design Specification [3]
ENG.6 Software Construction
[Details]
GO
ENG.7 Software Integration
[Details]
GO
ENG.8 Software Testing
[Details]
GO
ENG.9 System Integration
[Details]
GO
ENG.10 System Testing
[Details]
GO
ENG.11 Software Installation
[Details]
GO
ENG.12 Software and System Maintenance
[Details]
GO
MAN.1 Organisational Alignment
[Details]
GO
MAN.2 Organisation Management
[Details]
GO
MAN.3 Project Management
[Details]
GO
MAN.4 Quality Management
[Details]
GO
MAN.5 Risk Management
[Details]
GO
MAN.6 Measurement
[Details]
GO
OPE.1 Operational Use
[Details]
GO
OPE.2 Customer Support
[Details]
GO
PIM.1 Process Establishment
[Details]
GO
PIM.2 Process Assessment
[Details]
GO
PIM.3 Process Improvement
[Details]
GO
REU.1 Asset Management
[Details]
GO
REU.2 Reuse Program Management
[Details]
GO
REU.3 Domain Engineering
[Details]
GO
RIN.1 Human Resource Management
[Details]
GO
RIN.2 Training
[Details]
GO
RIN.3 Knowledge Management
[Details]
GO
RIN.4 Infrastructure
[Details]
GO
SPL.1 Supplier Tendering
[Details]
GO
SPL.2 Product Release
[Details]
GO
SPL.3 Product Acceptance Support
[Details]
GO
SUP.1 Quality Assurance
[Details]
GO
SUP.2 Verification
[Details]
GO
SUP.3 Validation
[Details]
GO
SUP.4 Joint Review
[Details]
GO
SUP.5 Audit
[Details]
GO
SUP.6 Product Evaluation
[Details]
GO
SUP.7 Documentation
[Details]
GO
SUP.8 Configuration Management
[Details]
GO
SUP.9 Problem Resolution Management
[Details]
GO
SUP.10 Change Request Management
[Details]
GO
HS @ 25.03.05